Void property electrical works: what gets done between tenancies
Void electrical works are the inspection, testing and remedial work done between tenancies: an EICR, any C1 and C2 remedials, smoke and heat alarm checks, and making good anything the outgoing tenant damaged. The work is straightforward. Getting it done quickly is what actually costs or saves money.
- A void is the one window where the work can be done without booking access.
- An empty property earns nothing, so days matter more than the day rate.
- The EICR and its remedials should be one visit, not two contractors.
- Alarm compliance is checked at the same time and is a common failure.
- Getting the certificate the same week is what lets the property be re-let.
What does the work usually cover?
A void visit is normally four things in one go.
- A full EICR on the fixed installation, because the property is empty and everything is accessible for once.
- The remedial work the report calls for, done there and then rather than booked as a second job.
- Smoke and heat alarms, checked, replaced where they are past their date, and brought up to the required standard for the property type.
- Repairs to whatever the last tenant left behind: broken accessories, missing covers, unauthorised additions, and the extractor fan that has not worked for two years.
Done properly it is one visit, one certificate and one invoice. Done badly it is an inspection, a wait for a quote, an approval, and a second visit, which is where the days go.
Why is turnaround the thing that matters?
Because an empty property is a property earning nothing while still costing council tax and standing charges. For a housing provider the void period is a tracked performance measure. For a private landlord it is straightforward lost rent.
Against that, the difference between one contractor's day rate and another's is small. A contractor who tests on Tuesday, does the remedials on Tuesday and issues the certificate on Wednesday is worth considerably more than one who is cheaper per hour and takes three weeks to come back.
That is the whole argument for handling inspection and remedial work under one roof, and it is how we run void and planned maintenance work.
Can remedials be done on the same visit?
Most of them, if the electrician arrives expecting to. The common C2 findings in a void are predictable: no RCD protection, missing earthing at lighting points, damaged accessories, undersized or unprotected outbuilding supplies, and bonding that was never upgraded.
A van stocked for that list fixes most of it the same day. What cannot be done on the spot is anything that turns out to need a board change or a partial rewire, and that is exactly the decision that should be flagged by phone within the hour rather than three days later in a written quote.
Agreeing an approval threshold up front helps enormously. If minor remedials up to an agreed value can just be done, most voids never need a second conversation.
What about smoke and heat alarms?
Alarm requirements differ by property type and by nation, and they have tightened. Rented properties in England need working smoke alarms on every storey and a carbon monoxide alarm in any room with a fixed combustion appliance other than a gas cooker.
The practical point in a void is that alarms have a service life, usually ten years, and a sealed unit past its date is not compliant even if it beeps when tested. Checking the date printed on the back is a thirty second job that saves a re-visit.
Interlinked mains powered alarms are the standard we fit where the property allows, because a sounder in the hall does not wake somebody in a back bedroom.
How does this work across a portfolio?
The thing that changes the economics is planning rather than pricing. Where we hold the inspection dates for a portfolio, voids stop being emergencies: a property that was already due its EICR gets it during the void instead of needing an access appointment six months later with a new tenant in it.
For letting agents the same logic applies to reminders. We keep the expiry dates and flag them before they lapse, which is covered on our landlord and letting agent page.
Questions we get asked about this
How quickly can you turn a void round?
Testing and standard remedials are usually one visit, with the certificate issued within a working day or two. Board changes and rewires need longer and we say so on the day we find them.
Do you work to a schedule of rates?
We can. For providers and agents with regular volume a rate schedule and an agreed approval threshold for minor remedials is normally the arrangement that keeps voids shortest.
Can you handle several properties at once?
Yes. Batching voids in the same area is more efficient for everyone and it is how we prefer to work across Milton Keynes, Bedford and Northampton.
What if the property fails badly?
You get a phone call the same day, not a letter next week, with what it needs and what it means for re-letting. A bad EICR is much cheaper to hear about early.
- The Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020, legislation.gov.uk
- Electrical safety standards in the private rented sector, guidance for landlords, gov.uk
- Electrical safety at work, hse.gov.uk
- Electrical Safety First, electricalsafetyfirst.org.uk
Checked on 01 September 2026. Regulations change, so if you are reading this a long way after that date, ring us and we will tell you what has moved.
Read this next
What landlords have to do about electrical safety
The five year rule, the 28 day rule, and the codes that decide whether you have passed.
Fuse boardsDoes my fuse board need replacing, or just repairing?
How to tell a board that needs replacing from a board doing exactly what it should.
RewiringDoes my house need a full rewire or a partial one?
Cable type decides this, not the age of the house. How to tell the difference.